Efficiency / Flexibility /
Speed
The ability to plow either
side of the track (without having to reverse the train) with
plow arms that can extend out to a range of 15 feet enables the
placement of as many as 18 innerduct (capable of carrying thousands
of cable strands) to a depth of up to six feet while efficiently
maneuvering around obstacles close to the tracks and reaching
beyond buried cables.
Feet per day is now miles per
day.
Quality Control / Ease of
Installation and Restoration / Prompt Response
Plow configuration is
specifically designed to minimize tension and bending of the
cable or conduit while burying plastic warning tape along
with the cable as an identification marker for future excavation.
In rough terrain, a pre-rip pass can
be executed before the cable is plowed. Several hydraulic levers
control the operation of the blade, allowing the operator to
avoid obstructions in the roadbed. In most cases, little or no
roadbed restoration is required.
With multiple plows, highly trained
crews, and a true national presence, our ability to execute virtually
any size project is unparalleled.
|